Makkah — Al-Khawajat Road, next to Kara Company Sat – Thu, 7 am – 6 pm
Mubarak Salih Factory Company for Industry logo Mubarak Salih FactoryCement · Volcanic · CurbstonesFormerly Al-Madinah Factory Request a quote
Supplier approval

What does the consultant need to approve a block supplier?

Supplier approval usually stalls for administrative reasons, not technical ones. These six documents cut the cycle from weeks to days.

5 min read · Mubarak Salih Factory

1) Material submittal form

Issued in the project’s name, it carries the names of the owner, main contractor and consultant, and specifies the work package, product type and size. This is the form the consultant signs to approve, and the document kept in the project file.

2) A recent third-party lab report

An old report, or one for a different size, isn’t enough. The consultant wants results for a sample of the required size, issued recently by an accredited third-party lab. The compressive strength report states the sample average and the individual values on net area.

3) Quality management system certificate

A valid ISO 9001:2015 certificate — and what matters is its scope, not just that it exists: does the scope cover manufacturing cement block, volcanic block and curbstones?

4) Local Content Certificate

Required on government and semi-government projects, it is issued by the Local Content and Government Procurement Authority (LCGPA) with a percentage calculated for a specific fiscal year and a validity date.

5) Statutory registration

Commercial Registration (CR), industrial license, municipal license, Zakat certificate and VAT registration — each with its number and validity date.

6) Product datasheet

Dimensions, weights and compressive strength for each product family, so the consultant can check them against the drawings and the BOQ.

Practical tip: send these six with your quote request, not after it. The time saved alone can be enough to tip the choice toward one supplier over another.

Have a project and need pricing? Specify the product, quantity and project location, and you’ll receive a quote with the supplier approval file within one business day.
Request a quote
Sales WhatsApp